Second Rough Plumbing Stage

Another activity that takes place while the walls are “open” is the second plumbing rough-in. It is called a rough-in because no finished fixtures will be installed yet. It is the second part of the rough because the first took place with the installation of plumbing pipes under the basement or first-floor concrete slab.

For all floors other than the basement or slab, the plumbing lines will be run up through the floors and behind the walls. If you have a blueprint, take your tape measure and verify the locations of hot, cold, and drain lines. There is some room for error during the first stage of rough plumbing (with the exception of toilet drains) because most lines can be adjusted to fit inside cabinets and under counters and sinks. But if the lines are off by more than a few inches, or they are missing completely, there will be some major problems after drywall is installed! Remember to mark additional plumbing options on your print and verify that they are present after the rough-in.

Helpful Hints:

Don’t forget: • icemaker line • additional fixtures outside the home or in the garage • basement or additional bathrooms • laundry tubs

Scroll to Top