Now it is time to “close-up” the walls that have been open since framing began. The material of choice for most builders is drywall (Sheetrock, gypsum, or wallboard).
Sheets of drywall are secured to the studs with screws and nails. The joints are then taped and covered with several coats of drywall compound or “mud.”
Hanging: According to the leading drywall manufacturer, the recommended pattern of nailing is as follows: Nailing: space nails a maximum of 7" apart on ceilings, 8" on walls, and at least 3/8" from ends and edges Screwing: space screws a maximum of 12" apart on ceilings, 16" on walls, and at least 3/8" from ends and edges of panels. Sink screws to just below the panel surface, leaving the paper intact.
Taping: The joints of the drywall need to be covered with mud and either paper or fiberglass mesh tape. If the joints were simply filled with drywall mud, cracks would begin to form wherever a void occurred. The tape, although not an adhesive, creates a continuous surface connecting all of the sheets of drywall.
Finish coats: The joints, corners, nail and screw marks are all covered with drywall mud. Several coats of drywall mud need to be applied, allowing at least a day before the next coat is applied. Each coat covers a larger area so that the joint or nail hole is hidden and seams are blended in with the wall.
Sanding: After all drywall compound has dried, it needs to be sanded. The joints are feathered out so they are not noticeable when they are painted. This is dusty procedure and not an activity you want to be around for! If you have ever been in a house after the drywall was sanded you know that the dust settles everywhere. The duct work should be covered to reduce the amount of dust settling in the HVAC system.
First Paint “Roll-out”: When the drywall is finished, the quality of the work cannot be seen completely until paint is applied. The first application to the walls and ceilings takes place just before the interior trim is installed. It is much easier to get a coat of paint on the walls before trim or any electrical or plumbing fixtures are installed.
The remaining steps in the construction process are all “finish stage” in nature- interior trim, cabinets, flooring, final electrical and plumbing, yard and landscaping. It is up to your trained eye to determine if these stages of work were correctly done. The formal review of all of these finishes and the demonstration of how all of the systems described above all work together takes place in your walk-through.