Another trademark of a builder that doesn’t understand settling of backfilled material is the sunken driveway, walkway, or porch. This settling usually takes place because of poor backfilling of the foundation wall or trench from underground utilities. You now know about backfilling garages and basements, and the same theory applies to trenches. When underground utilities such as electricity, gas, and water are installed, a trench is dug. The deeper this trench is, the greater the chance of settling. There are ways to prevent settling over trenches, though. The natural way is simply waiting! Over time, the clumps of earth that were dumped back into the trench will compact under their own weight and more fill can be placed over it. Another trick of the trade is to introduce water to the fill, which accelerates the settling. The preferred method is to use sand or gravel to backfill a trench. Sand and gravel have fewer air pockets than clumps of soil, especially clay or frozen soil, so fewer voids have to be filled. If the builder pours a walkway over an uncompacted
trench, the soil will settle and a void will develop under the slab, leaving it unsupported.