Before your lower-level concrete floor (basement or first floor) is poured, a rough plumbing installation will take place. If you have a basement, there won’t be much to see, just the waste water lines. If you will have a rough-in for a bathroom in the basement, you will want to verify the location of the drains before the concrete floor is poured. If your concrete lower level is your first floor, all of your drains will be visible before your floor is poured. Again, you will want to verify the locations of both drains and water lines for sinks and toilets, because once the concrete is poured, it becomes a mess to move the plumbing lines.
If your home will have a basement, the walls will either be poured in place with concrete or built from concrete blocks. The basement/crawl-space walls will be constructed on the foundation. The width of the walls will depend on the material used (poured concrete or concrete block), the height of the wall, and the load each wall will have to bear.
You can learn more about concrete in Appendix B: Concrete.