Contract Addendums

A solid purchase agreement or contract is the first line of defense to protect yourself throughout the homebuilding process, but there are other documents you will need to bring to the attention of your attorney. As mentioned before, you will want to gather as much of the builder’s literature as possible early on in your visit to the model home or sales center. As you move further

along in the process, you will need to have copies of the following documents for your attorney to review:

• purchase agreement • warranty • HOA (Home Owner’s Association) and CCR (Covenants Conditions and Restriction) documents • plot plan, with easements marked, of the lot you are considering • standard preprinted Contingencies and Addendums

Your Ammunition against One-Sided Builder Contracts Changes and additions made to the documents mentioned above are usually done so with addendums. Although I am not an attorney nor do I play one on TV, I am simply suggesting that these are things you should discuss with your attorney. There are several addendums that you will want to consider adding to you purchase agreement (all of these addendums will not necessarily apply to your situation):

1. Addendum: The new home must appraise at or above the sales price. With all of the tricky pricing I mentioned in Chapter Five, you will want to make sure that your home is perceived to be valued at or above the purchase price. The problem is that an appraisal can be subjective. Depending on whose side the appraiser is on, they can make the numbers “work” or make them come out in their favor. This is especially true if you are using the builder’s lender. You want an independent appraisal to protect yourself. If you are building a unique, multimillion-dollar home and paying cash for it, an appraisal is unnecessary. There is no bank to worry about you overpaying and then getting stuck with a house they can’t resell if they have to foreclose. More likely,

you will have a mortgage on your house, and a bank that cares what happens in the event of a foreclosure.

2. Addendum: The new home site must pass all relevant tests (perk test for a ground stability and/or septic system compatibility, radon test, soils test). You do not want to be stuck with a home on poor soil that causes your house to settle or your septic system to operate improperly.

3. Addendum: The new home must be code compliant. If you think this is a no-brainer, think again. Just because a municipal inspector signed off on your house does not mean that every aspect of the home’s construction is compliant with building codes. This addendum is not a demand for something above and beyond what is promised by the builder or within industry standards. Rather, it is to ensure that you are getting what you pay for.

4. Addendum: You have the right to review the actual plans prior to construction (not just the sample version shown in marketing material). You can review the locations of switches, the swing of doors, height of ceilings, etc., but the real review will take place by your inspector. This is a good first step for your inspector, who will be making several site visits to become acquainted with the intended design of the house. Just as you will be preparing a packet of material for your attorney to review, your inspector will need similar help in performing his or her job. Your inspector will need a complete set of plans, specifications, and included features, your additional selections and changes, and plot plan.

5. Addendum: Specifications and Materials List. Make sure the spec sheet outlines color, model names, and model numbers, but also that it states that these must be installed according to manufacturer instructions. Your inspector will be able to see if the major installed components such as windows, doors, and shingles comply with manufacturers recommendations. I have seen plenty of windows and doors that leak because they were installed improperly, thus voiding the manufacturer’s warranty. And wouldn’t you know it, the builder’s warranty either had expired or excluded coverage of that part of the home. Also demand that you be supplied with all warranties for installed components. If the components were installed correctly and the warranty is registered to you, you may be protected long after the builder’s warranty expires. Most contracts state that materials may be substituted for those of greater or equal value, which is fine, but they may not be your choice of style. Simply add that you must approve changes in materials to avoid any problems.

6. Addendum: The builder and customer will agree on the features of the lot that will be protected. This is especially important if you chose a lot because of a particular feature, like a tree. If that tree is damaged, you should be compensated.

7. Addendum: The home will be complete before closing. If no loophole appears in the purchase agreement, one will surely surface on one of the last forms you sign: the “punch list” or whatever form is used to document items that need to be corrected before closing.

Binding Arbitration: Who Does It Help/Hurt? One of the hot topics in real estate law today is the binding arbitration clause that big builders are using in their contracts. In a nutshell, binding arbitration keeps your problem with the builder out of a courtroom. In doing so, it saves time and money for both parties, but can end up limiting rights you would normally have if the case were argued before a judge and jury.

Pros: The biggest benefit to arbitration is that it allows for quick settlement of your dispute. Because it is quicker and (in the case of binding arbitration) final, there is less money spent on legal fees.

Cons: If the arbitration you enter into with the builder is binding, the decision of the arbitrator is final; there are no appeals. If you don’t like the ruling of the arbitrator, this is clearly a problem. Also, you will not have the benefit of twelve jurors that may be more sympathetic to your plight.

I had experience with a large builder that was sued regularly. The builder’s legal strategy was to settle with no one. I saw cases go on for years without resolution. In the case of this builder, had the claims gone to arbitration, at least some chance of settlement would have been possible. In the end, the builder went bankrupt and a number of homeowners with serious claims never had any resolution to their problems. Instead, the homeowners were out thousands of dollars in legal fees and stuck with defective houses.

Industry Insight: Legal Arm Twisting

Most large builders have a great deal of legal expertise at their disposal and don’t fear a lawsuit from a customer because the assumption is they have deeper pockets than their customers. In most cases, appeal after appeal drags on, and along the way the disgruntled customers drop their cases in the face of mounting legal bills. Sometimes a group of homeowners think they have a better chance by banding together and filing a class action suit against the builder. Unfortunately, the outcome is often not much different.

The National Association of Home Builders (NAHB) was instrumental in writing the American Arbitration Association (AAA), Construction Industry Arbitration Rules which were adopted in 1996 and have become the industry standard for arbitration hearings. Simultaneously, NAHB led an effort to promote an industry-wide prorogated Builder Sales Contract containing a mandatory binding arbitration clause stipulating AAA as the arbitrator, conducted under the AAA Construction Industry Arbitration Rules. In the last four years, an industry watchdog group, HADD, has seen only two cases where homeowners were made whole by arbitration, and those were both independent arbitrators- – not AAA.

The bottom line is that homeowners are overwhelmingly on the losing end of arbitration. Therefore, it is very important not to agree to any type of binding arbitration in your building contract.

Other Contract Points: