Walk-Through and Punch-Out
The walk-through, also known as a new home presentation or orientation, is your chance to review the final product delivered to you. You will be given the opportunity to document any problems (creating what is called a “Punch List”) you have with the home and have them corrected before you close. If you have taken this book’s recommendations throughout your building process, your walk-through should be a breeze. If not, major items that may be difficult to repair at this stage could appear and make your last step in the process a difficult one.
Another function of the walk-through is to learn about the operation and care of the home. Since this is a new home, you may not be familiar with some of the new features. It is the builder’s role to explain them to you. Be sure to ask questions; it’s the builder’s job to know the answer. The reality is that he may not always know the right answer, so try to verify anything that may sound unreasonable. I was at a walk-through with a builder and a customer asked what was under the black cap in the basement floor. The builder told the customer it was a check valve (which was correct) that prevented any of the toilets in the home from overflowing (which is not correct). In this case, the check valve was installed to prevent sewage from surrounding homes from backing up into the lower level of the home.
There are some items the person conducting your walk-through must explain, show, or demonstrate to you.
• water shutoff(s): check for a main shutoff for the entire house’s water supply. If a pipe ever breaks, you need to have easy access to the shutoff to stop the flow and prevent further damage. • gas water heater or furnace pilot light: most furnaces now have an automatic pilot light but many gas water heaters do not. Have the builder demonstrate the proper lighting technique. • sump pump dedicated electric line: if you have a sump pump it should be plugged into a dedicated outlet on its own circuit. • proper electrical panel description: the electrical panel should be easy to access and each circuit/room properly labeled so that you can troubleshoot when a circuit breaker trips. The labels should be logical and legible.
Your walk-through should take place after your architect or inspector has completed a thorough inspection of the entire
finished home and checked for the proper installation and operation of all the building components, code, and industry standard compliance. You should have a copy of the final report to use during the walk-through to review with the builder.
Before the walk-through, the home must be clean and 100 percent complete. If the home is not clean, it is difficult to identify damage to items such as cabinets and counter tops whose cosmetic condition may not be warranted after closing. If finish items (such as carpet or baseboards) are missing at the walk-through, the chance of damaging some other part of the home when they are installed increases, creating more delays and problems.
To cut down on confusion, bring along a copy of the contract, plans, specifications, options, selections, and change orders for the house. If a color or fixture is wrong, it is much easier to prove when you have documentation of what you ordered. If industry standards apply in the area, make sure you not only understand them, but also bring them along. This comes in handy when questions arise about when something such a crack in a concrete slab warrants repair or replacement.
Your walk-through should be conducted with the supervisor or person you have been dealing with up to this point. Sometimes builders use one of their service technicians or warranty representatives to perform the walk-through. If the supervisor who is familiar with you and the job is not present, the person conducting the walk-through may not be familiar with any ongoing issues you have had with the home. Moreover, you will be wasting time bringing that person up to speed. Having both the supervisor and the warranty representative (or whoever will be responsible for any warranty claims you have on the home after closing) present could be a benefit. It would be in the best
interest of whoever handles your claims after closing to ensure that your home is in good shape before closing.
The builder may have performed dozens or even hundreds of walk-throughs, and may have a set routine. A routine is fine as long as it doesn’t rush things along, make you uncomfortable, or place the balance of power in his hands. Don’t let the builder dismiss your requests with comments like “We never do that,” “That’s as good as it gets,” or “That’s the way it’s supposed to be.” Remember, you should have already set the tone from day one in the building process: I am the customer, I have high expectations for the finished product, and I am going to protect myself to ensure that I get what I pay for. Do not allow the builder to bully you or pressure you into accepting a defect. If it’s not right don’t close.
Industry Insight: “But we always do it that way.” The fact that a builder “always does it that way” is in no way reassurance that it is the right way to do it. This is especially dangerous when it comes to production builders because they repeat the same techniques on every home. I have seen production builders repeat a flawed construction technique hundreds of times resulting in literally millions of dollars in damage. It is one thing to make a mistake, but another thing to make the mistake part of your routine and repeat it hundreds of times.
If you are using a standardized “walk-through form” supplied by the builder that only has a few small lines to document the defects you find, forget about it! That is just a ploy to make it look like you should only have a few items that you need corrected or that the sheet is only for major problems that need to be addressed. I know of a builder who actually revised the walk-through form so that it had half as many preprinted lines to list
items. Changing the form resulted in fewer items on each walk-through. If not many problems exist, great. But if many do exist, they need to be documented. You may need to use more than one form to list all of your “punch list” items or you can write “continued on page ___” on the original form and continue on another sheet.
Don’t make any verbal agreements with the builder. If they really are going to do what they say, they shouldn’t have any problem putting it in writing! Don’t fall for any of their sob stories about how the supervisor will be fired if he has another punch list with a lot of items, etc. Oh, and one more thing — no side lists. A side list is a list of items the builder agrees to do –they just don’t want them on the “official” punch list form. Remember that the punch list form you are using is a legal document. Any other side lists you create hold no more weight than a verbal agreement. Some builder’s walk-through forms used to make punch lists actually contain language to the effect that no other agreements, verbal or written, have been made between you and the builder, or any of its employees or subcontractors. But you should know that because your attorney would have already reviewed it.
I can’t stress enough how important it is to have the home complete before you close on the house and the builder gets its money. I have seen hundreds of cases where homeowners move into a home that “had just a few things” that needed to be completed. Well, those few things either took months to get done or were never completed at all. Just as important is never accepting a verbal agreement for work that needs to be completed after the walk-through. I have heard from HUNDREDS of homeowners who said someone “told me,” “promised me,” “swore to me” that “he was going to be back to fix it.” When the person who made the promise is fired, quits, or
moves to another community, you will be left holding the bag caught playing a game of he-said she-said.
It is critical not only to document every problem, but also to have in writing exactly what the builder will do to correct the problem. For example, see the big difference between:
Item 26 Scratch in counter top right of kitchen sink
and
Item 26 Replace counter top due to scratch right of sink
The first statement puts remedy of the problem at the discretion of the builder. The second statement clearly states your intended solution to the problem.
Remember that your walk-through is to identify major items that need to be addressed. Do not be overly concerned about slight paint or drywall imperfections. You need to see the forest through the trees. If your face is plastered against the wall trying to find an imperfection in paint, you may miss something bigger, like a floor out of level. If you have followed the advice in this book, you will undoubtedly have a reputation with the supervisor! The supervisor may not be used to the way that you are approaching the homebuilding process. While you may be known as the “picky customer,” they need to understand you are only trying to protect yourself and to get what you paid for –nothing more, nothing less. The supervisor should know and understand that.